TM 75053
ML594/U
7. MAJOR COMPONENTS:
12. REPAIR PARTS SUPPORT CAPABILITY:
Canopy.
To 1975--Full support.
Canopy support.
13. TRAINING REQUIREMENTS:
Case, transit windbreak frame assembly.
Operator MOS 93E20, 93F20.
Nozzle assembly.
Maintenance MOS 35D20.
8. SET, SYSTEM, FACILITY, AND CONFIGURATION
14. TYPICAL
BASIS OF ISSUE:
APPLICATIONS:
TA
Allowance
This device is used with Volume Meter, Hydrogen-
M7W04SAA
_ _ _ _ _ _ _ _ _ _ _1
Helium ML605/U in a fast-riser balloon system.
M7W04WAA
___________2
9. ADDITIONAL EQUIPMENT REQUIRED AND AUX-
M7W04ZAA
_ _ _ _ _ _ _ _ _ _ _1
ILIARY EQUIPMENT:
5AW2NTAA
_ _ _ _ _ _ _ _ _ _6
a. Additional Equipment.
15. PRICE DATA:
Shovel.
a. M a j o r i t e m _ _ _ _ _ _ _ _ _ _ _ _ _ ,602.00
Mallet.
Ring to release the canopy master loop release strap.
b. Repair parts (1-year cost based on 100
b. Auxiliary Equipment. None.
equipments) _ _ _ _ _ _ _ _ _ _ _ __,030,00
10. TOOLS AND TEST EQUIPMENT: None.
16. ITEM REPLACED:
Balloon Shroud ML424/U and Inflation Tent ML
11. REFERENCE DATA AND LITERATURE:
1957.
TM 11666023815, 25P
ML594/U
TM 11666024515, 25P
ML605/U
17. REMARKS: None.
176