TM 11-6660-200-14
4-8.
11.
Assemble connector J1 (1) by pushing case (2) and retainer (3) together and securing with screw (4).
12.
Wrap electrical tape around wires (5) and cable (6) from bottom of connector J1 (1) down 3 inches (7.62 cm).
13.
Install cable clamps (7), two screws (8), lock washers (9), and nuts (10) on cable (6) in area where electrical tape
is wrapped.
14.
Aline notch (11) in connector J1 (1) with pin (12) in connector housing (13) and push connector J1 into place.
NOTE
Allow for slack in wires between connector J1 and cable clamp. Move cable clamp if
necessary to increase or reduce slack.
15.
Install two screws (14) and lock washers (15).
NOTE
For T-4201GMQ-11 and T-420B/GMQ-11, perform step 16. For T-420A/GMQ-11, perform step 17.
16. Install gasket (16), connector housing cover (17), four screws (18), and lock washers (19).
17. Install gasket (16) and close hinged connector housing cover (20).
1.
Remove nose cap (1) from impeller (2).
2.
3.
Install three screws (4) and lock washers (5) through impeller (2) into hub (3).
4.
Press nose cap (1) into impeller (2) recess.
4-11