TM 11-6660-200-14
4-36.
PREPARATION FOR STORAGE OR SHIPMENT. (CONT)
NOTE
Steps given are for both flexible and conduit interconnection cables.
1.
2.
Pull connector J1 (3) out of connector housing (4).
3.
Remove two screws (5), lockwashers (6), nuts (7), and clamps (8).
4.
Remove tape (9) from wires.
5.
Loosen screw (10) on connector J1 (3) and separate case (11) and retainer (12).
6.
Push cable (13) into retainer (12) to gain access to pins (14).
NOTE
For correct soldering methods, refer to TB SIG 222.
7.
NOTE
For flexible cable removal, perform step 8. For conduit cable removal, perform steps 9 and 10.
8.
Pull cable (13) out from bottom of lower mast section (16). Roll up cable and tie free ends to coil. Perform
step 11.
9.
Remove clamps (17) securing conduit (18) to lower mast section (16).
10
Disconnect conduit (18) from connector housing (4) and install pipe plug (19).
11.
Install eight pins (14) in case (11) and assemble with retainer (12).
12.
Tighten screw (10).
13.
Assemble two clamps (8) with two screws (5), lockwashers (6), and nuts (7).
14.
Place assembled clamps (8) inside connector housing (4) to prevent loss.
15.
Install connector J1 (3) in connector housing (4) alining notch on connector J1 with pin inside connector
housing.
16.
NOTE
For T-4201/GMQ-11 and T-420B/GMQ-11, perform step 17. For T-420A/GMQ-11, perform step 18.
17. Install gasket (20), cover (21), four screws (22), and lockwashers (23).
18. Install four screws (22), lockwashers (23), gasket (20), and close cover (24).
4-49