TM 11-6660-266-13
Table 2-8. DCT/MARWIN Processor Status Messages
Message
Definition
DCT STATUS: (4)
Status message (4) is generated by the DCT and transmitted to the
NO RESPONSE FROM DEST.
MARWIN Processor as a response for the pending MET message
transaction, indicating that no response has been received from the
Destination Address, and that this condition persisted after four
transmission attempts (original attempt plus three retrys).
DCT STATUS: (5)
Status message (5) is generated by the DCT and transmitted to the
DCE ERROR
MARWIN Processor as a response for the pending MET message
transaction, indicating that the current MET message transaction has
been cancelled by the DCT operator and that the message will not be
DCT STATUS: (6)
Status message (6) is generated by the DCT and transmitted to the
MESSAGE CANCELLED
MARWIN Processor as a response for the pending MET message
transaction, indicating that the required external clock has not been
received when interfacing with the DCE.
DCT STATUS: (10)
Status message (10) Is generated by the DCT and transmitted to the
MARWIN Processor as an alert indicating that a SYS PTM has been
SYS; PTM RECEIVED
received on the FATDS network addressed to this terminal and has been
placed In a DCT receive buffer for display as a text string upon operator
action at the DCT.
2-7. OPERATION OF AUXILIARY EQUIPMENT.
Operating instructions for balloon inflation equipment, balloon equipment and accessories, radiosondes, and
miscellaneous components necessary for operation of the AN/TMQ-38 are contained in TM 11-6660-218-12.
2-8. PREPARATION FOR MOVEMENT.
Preparation for movement is performed in reverse order of the Installation Instructions (paragraph 2-4-4, steps a.
through i.). After primary input power is disconnected from the system, there is no preferred order for
disassembly of the operator or antenna sites. The equipment may be disassembled and repacked in any order or
at the same time, number of personnel permitting. To prepare the AN/TMQ-38 for movement, the following 9
major steps must be performed:
Disconnect primary input power
Repack the 24 VDC Power Supply
Disassemble and repack the RDF Unit
Disassemble and repack the NAVAlD Antenna Set
Disconnect and repack the interconnect cables and grounding cables
Repack the Power Supply Unit
Repack the DCT
Repack the Printer
Repack the Marwin Processor
2-48