TM 11-6660-266-13
h. Install RDF Unit as follows:
TO PREVENT INJURY TO PERSONNEL,
TWO SOLDIERS ARE REQUIRED TO
LIFT AND INSTALL THE MAJOR
COMPONENTS OF THE RDF UNIT.
(1) Install RDF tripod (4) as follows:
(a) Remove tripod from carrying bag and
support tripod so that only leg pads (6) are in
contact with ground.
(b) Remove locking clip (8) from ring-headed
pin (9). Remove pin from tripod.
2-33